Source:xzxw.com 2025-07-31
On July 27, at the construction site of the Huadian Qonggyai 60MW Wind Power Project, which sits at an average altitude of 5,228 meters, the final 95-meter-long, 26-ton wind turbine blade of Unit 12 was precisely positioned into its designated place, marking the successful installation of the first wind turbine in the world's highest-altitude wind power project currently under construction.
Photo: Xizang Daily
Editor: Zhang Qi, Zheng Yujie
Translator: Luo Rongting, Zhi Xinghua
Review: Drakpa Wangchen, Zhang Qi
Copyright © Xizang Daily & China Xizang News All rights reserved
Reproduction in whole or in part without permissions prohibited
Index Code: 藏 ICP 备 05000021 号
Producer: Xizang Daily International Communication Center