Source:xzxw.com 2026-04-02


The electrification external power supply project for the railway consists of two sections: Qinghai and Xizang, with a total investment of 14.902 billion yuan (RMB). And the Xizang section accounts for 7.518 billion yuan (RMB), with plans to build two new 500-kilovolt substations, two 220-kilovolt substations and switchyards, and 1,552.5 kilometers of new power lines (calculated as single-circuit length).
Photo: Xizang Daily
Editor: Zhang Yuxin, Yang Xiaofeng
Translator: Zheng Yujie, Zhi Xinghua
Review: Pan Lu, Drakpa Wangchen
Copyright © Xizang Daily & China Xizang News All rights reserved
Reproduction in whole or in part without permissions prohibited
Index Code: 藏 ICP 备 05000021 号
Producer: Xizang Daily International Communication Center